Skip to main content
Erschienen in: Journal of Intelligent Manufacturing 6/2017

14.02.2015

A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem

verfasst von: Antonio Costa, Fulvio Antonio Cappadonna, Sergio Fichera

Erschienen in: Journal of Intelligent Manufacturing | Ausgabe 6/2017

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In this paper, the flow-shop sequence-dependent group scheduling (FSDGS) problem is addressed with reference to the makespan minimization objective. In order to effectively cope with the issue at hand, a hybrid metaheuristic procedure integrating features from genetic algorithms and random sampling search methods has been developed. The proposed technique makes use of a matrix encoding able to simultaneously manage the sequence of jobs within each group and the sequence of groups to be processed along the flow-shop manufacturing system. A well-known problem benchmark arisen from literature, made by two, three and six-machine instances has been taken as reference for both tuning the relevant parameters of the proposed procedure and assessing performances of such approach against the two most recent algorithms presented in the body of literature addressing the FSDGS issue. The obtained results, also supported by a properly developed ANOVA analysis, demonstrate the superiority of the proposed hybrid metaheuristic in tackling the FSDGS problem under investigation.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Allahverdi, A., Gupta, J. N. D., & Aldowaisian, T. (1999). A review of scheduling research involving setup considerations. OMEGA, The International Journal of Management and Science, 27(2), 219–239.CrossRef Allahverdi, A., Gupta, J. N. D., & Aldowaisian, T. (1999). A review of scheduling research involving setup considerations. OMEGA, The International Journal of Management and Science, 27(2), 219–239.CrossRef
Zurück zum Zitat Baker, K. R., & Trietsch, D. (2009). Principles of sequencing and scheduling. Hoboken, NJ: Wiley.CrossRef Baker, K. R., & Trietsch, D. (2009). Principles of sequencing and scheduling. Hoboken, NJ: Wiley.CrossRef
Zurück zum Zitat Baykasoglu, A. (2004). A metaheuristic algorithm to solve quadratic assignment formulations of cell formation problems without presetting numbers of cells. Journal of Intelligent Manufacturing, 15, 753–759.CrossRef Baykasoglu, A. (2004). A metaheuristic algorithm to solve quadratic assignment formulations of cell formation problems without presetting numbers of cells. Journal of Intelligent Manufacturing, 15, 753–759.CrossRef
Zurück zum Zitat Celano, G., Costa, A., & Fichera, S. (2010). Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times. The International Journal of Advanced Manufacturing Technology, 46(5–8), 695–705.CrossRef Celano, G., Costa, A., & Fichera, S. (2010). Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times. The International Journal of Advanced Manufacturing Technology, 46(5–8), 695–705.CrossRef
Zurück zum Zitat Cheng, T. C. E., Gupta, J. N. D., & Wang, G. (2000). A review of flowshop scheduling research with setup times. Production and Operations Management, 9(3), 262–282.CrossRef Cheng, T. C. E., Gupta, J. N. D., & Wang, G. (2000). A review of flowshop scheduling research with setup times. Production and Operations Management, 9(3), 262–282.CrossRef
Zurück zum Zitat Costa, A., Cappadonna, F. A., & Fichera, S. (2013). A dual encoding-based meta-heuristic algorithm for solving a constrained hybrid flow shop scheduling problem. Computers & Industrial Engineering, 64(4), 937–958.CrossRef Costa, A., Cappadonna, F. A., & Fichera, S. (2013). A dual encoding-based meta-heuristic algorithm for solving a constrained hybrid flow shop scheduling problem. Computers & Industrial Engineering, 64(4), 937–958.CrossRef
Zurück zum Zitat Crepinsek, M., Liu, S. H., & Mernik, M. (2013). Exploration and exploitation in evolutionary algorithms: A survey. ACM Computing Surveys, 45(3), art. 35. Crepinsek, M., Liu, S. H., & Mernik, M. (2013). Exploration and exploitation in evolutionary algorithms: A survey. ACM Computing Surveys, 45(3), art. 35.
Zurück zum Zitat França, P. M., Gupta, J. N. D., Mendes, A. S., Moscato, P., & Veltink, K. J. (2005). Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers & Industrial Engineering, 48(3), 491–506.CrossRef França, P. M., Gupta, J. N. D., Mendes, A. S., Moscato, P., & Veltink, K. J. (2005). Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups. Computers & Industrial Engineering, 48(3), 491–506.CrossRef
Zurück zum Zitat Gallagher, C. C., & Knight, W. A. (1986). Group technology production methods in manufacturing. England: Ellis Horwood Limited. Gallagher, C. C., & Knight, W. A. (1986). Group technology production methods in manufacturing. England: Ellis Horwood Limited.
Zurück zum Zitat Gao, J., Gen, M., & Sun, L. (2006). Scheduling jobs and maintenance in flexible job shop with a hybrid genetic algorithm. Journal of Intelligent Manufacturing, 17(4), 493–507.CrossRef Gao, J., Gen, M., & Sun, L. (2006). Scheduling jobs and maintenance in flexible job shop with a hybrid genetic algorithm. Journal of Intelligent Manufacturing, 17(4), 493–507.CrossRef
Zurück zum Zitat Gen, M., & Cheng, R. (2000). Genetic algorithms and engineering optimization (engineering design and automation). NY: Wiley. Gen, M., & Cheng, R. (2000). Genetic algorithms and engineering optimization (engineering design and automation). NY: Wiley.
Zurück zum Zitat Hajinejad, D., Salmasi, N., & Mokhtari, R. (2011). A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem. Scientia Iranica, 18(3), 759–764.CrossRef Hajinejad, D., Salmasi, N., & Mokhtari, R. (2011). A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem. Scientia Iranica, 18(3), 759–764.CrossRef
Zurück zum Zitat Ham, I., Hitomi, K., & Yoshida, T. (1985). Group technology: Applications to production management. Hingham, MA: Kluwer.CrossRef Ham, I., Hitomi, K., & Yoshida, T. (1985). Group technology: Applications to production management. Hingham, MA: Kluwer.CrossRef
Zurück zum Zitat Hendizadeh, H., Faramarzi, H., Mansouri, S. A., Gupta, J. N. D., & ElMekkawy, T. Y. (2008). Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 111(2), 593–605.CrossRef Hendizadeh, H., Faramarzi, H., Mansouri, S. A., Gupta, J. N. D., & ElMekkawy, T. Y. (2008). Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times. International Journal of Production Economics, 111(2), 593–605.CrossRef
Zurück zum Zitat Hitomi, K., & Ham, I. (1976). Operations scheduling for group technology applications. Annals of CIRP, 25, 419–422. Hitomi, K., & Ham, I. (1976). Operations scheduling for group technology applications. Annals of CIRP, 25, 419–422.
Zurück zum Zitat Hyer, N. L., & Wemmerloev, U. (1989). Group technology in the US manufacturing industry: A survey of current practices. International Journal of Production Research, 27, 1287–1304.CrossRef Hyer, N. L., & Wemmerloev, U. (1989). Group technology in the US manufacturing industry: A survey of current practices. International Journal of Production Research, 27, 1287–1304.CrossRef
Zurück zum Zitat Kim, K. W., Gen, M., & Yamazaki, G. (2003). Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling. Applied Soft Computing, 2(3), 174–188.CrossRef Kim, K. W., Gen, M., & Yamazaki, G. (2003). Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling. Applied Soft Computing, 2(3), 174–188.CrossRef
Zurück zum Zitat Lin, H. T., & Liao, C. J. (2003). A case study in a two-stage hybrid flow shop with setup time and dedicated machines. International Journal of Production Economics, 86(2), 133–143.CrossRef Lin, H. T., & Liao, C. J. (2003). A case study in a two-stage hybrid flow shop with setup time and dedicated machines. International Journal of Production Economics, 86(2), 133–143.CrossRef
Zurück zum Zitat Logendran, R., & Sriskandarajah, C. (1993). Two-machine group scheduling problem with blocking and anticipatory setups. European Journal of Operational Research, Special Issue on Cellular Manufacturing Systems, 69(3), 467–481.CrossRef Logendran, R., & Sriskandarajah, C. (1993). Two-machine group scheduling problem with blocking and anticipatory setups. European Journal of Operational Research, Special Issue on Cellular Manufacturing Systems, 69(3), 467–481.CrossRef
Zurück zum Zitat Logendran, R., Mai, L., & Talkington, D. (1995). Combined heuristics for bi-level group scheduling problems. International Journal of Production Economics, 38(2–3), 133–145.CrossRef Logendran, R., Mai, L., & Talkington, D. (1995). Combined heuristics for bi-level group scheduling problems. International Journal of Production Economics, 38(2–3), 133–145.CrossRef
Zurück zum Zitat Logendran, R., & Sirikrai, V. (2000). Machine duplication and part subcontracting in the presence of alternative cell locations in manufacturing cell design. Journal of the Operational Research Society, 51, 609–624.CrossRef Logendran, R., & Sirikrai, V. (2000). Machine duplication and part subcontracting in the presence of alternative cell locations in manufacturing cell design. Journal of the Operational Research Society, 51, 609–624.CrossRef
Zurück zum Zitat Logendran, R., Salmasi, N., & Sriskandarajah, C. (2006). Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. Computers & Operations Research, 33(1), 158–180.CrossRef Logendran, R., Salmasi, N., & Sriskandarajah, C. (2006). Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. Computers & Operations Research, 33(1), 158–180.CrossRef
Zurück zum Zitat Luo, H., Zhang, A., & Huang, G. Q. (2013). Active scheduling for hybrid flowshop with family setup time and inconsistent family formation. Journal of Intelligent Manufacturing (in press). doi:10.1007/s10845-013-0771-9 Luo, H., Zhang, A., & Huang, G. Q. (2013). Active scheduling for hybrid flowshop with family setup time and inconsistent family formation. Journal of Intelligent Manufacturing (in press). doi:10.​1007/​s10845-013-0771-9
Zurück zum Zitat Mahmoodi, F., & Dooley, K. J. (1991). A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell. International Journal of Production Research, 29, 1923–1939.CrossRef Mahmoodi, F., & Dooley, K. J. (1991). A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell. International Journal of Production Research, 29, 1923–1939.CrossRef
Zurück zum Zitat Marinakis, Y., & Marinaki, M. (2013). Combinatorial neighbourhood topology particle swarm optimization algorithm for the vehicle routing problem. Evolutionary Computation in Combinatorial Optimization. Lecture Notes in Computer Science, 7832, 133–144.CrossRef Marinakis, Y., & Marinaki, M. (2013). Combinatorial neighbourhood topology particle swarm optimization algorithm for the vehicle routing problem. Evolutionary Computation in Combinatorial Optimization. Lecture Notes in Computer Science, 7832, 133–144.CrossRef
Zurück zum Zitat Meeran, S., & Morshed, M. S. (2012). A hybrid genetic tabu search algorithm for solving job shop scheduling problems: A case study. Journal of Intelligent Manufacturing, 23(4), 1063–1078.CrossRef Meeran, S., & Morshed, M. S. (2012). A hybrid genetic tabu search algorithm for solving job shop scheduling problems: A case study. Journal of Intelligent Manufacturing, 23(4), 1063–1078.CrossRef
Zurück zum Zitat Michalewicz, Z. (1994). Genetic algorithms + data structures = evolution programs (2nd ed.). Berlin: Springer.CrossRef Michalewicz, Z. (1994). Genetic algorithms + data structures = evolution programs (2nd ed.). Berlin: Springer.CrossRef
Zurück zum Zitat Montgomery, D. C. (2008). Design and analysis of experiments (7th ed.). Hoboken, NJ: Wiley. Montgomery, D. C. (2008). Design and analysis of experiments (7th ed.). Hoboken, NJ: Wiley.
Zurück zum Zitat Naderi, B., & Salmasi, N. (2012). Permutation flowshops in group scheduling with sequence-dependent setup times. European Journal of Industrial Engineering, 6(2), 177–198.CrossRef Naderi, B., & Salmasi, N. (2012). Permutation flowshops in group scheduling with sequence-dependent setup times. European Journal of Industrial Engineering, 6(2), 177–198.CrossRef
Zurück zum Zitat Nawaz, M., Enscore, E. E, Jr, & Ham, I. (1983). A heuristic algorithm for the \(m\)-machine, \(n\)-job flow-shop sequencing problem. OMEGA, The International Journal of Management and Science, 11(1), 91–95.CrossRef Nawaz, M., Enscore, E. E, Jr, & Ham, I. (1983). A heuristic algorithm for the \(m\)-machine, \(n\)-job flow-shop sequencing problem. OMEGA, The International Journal of Management and Science, 11(1), 91–95.CrossRef
Zurück zum Zitat Paredes, F., Suresh, N. C., & Kay, J. M. (1998). Group technology and cellular manufacturing: A state-of-the-art synthesis of research and practice. Boston: Kluwer. Paredes, F., Suresh, N. C., & Kay, J. M. (1998). Group technology and cellular manufacturing: A state-of-the-art synthesis of research and practice. Boston: Kluwer.
Zurück zum Zitat Pinedo, M. L. (2012). Scheduling: Theory, algorithms and systems (4th ed.). New York, NY: Springer. Pinedo, M. L. (2012). Scheduling: Theory, algorithms and systems (4th ed.). New York, NY: Springer.
Zurück zum Zitat Salmasi, N., & Logendran, R. (2008). A heuristic approach for multi-stage sequence-dependent group scheduling problems. Journal of Industrial Engineering International, 4(7), 48–58. Salmasi, N., & Logendran, R. (2008). A heuristic approach for multi-stage sequence-dependent group scheduling problems. Journal of Industrial Engineering International, 4(7), 48–58.
Zurück zum Zitat Salmasi, N., Logendran, R., & Skandari, M. R. (2010). Total flow time minimization in a flowshop sequence-dependent group scheduling problem. Computers & Operations Research, 37(1), 199–212.CrossRef Salmasi, N., Logendran, R., & Skandari, M. R. (2010). Total flow time minimization in a flowshop sequence-dependent group scheduling problem. Computers & Operations Research, 37(1), 199–212.CrossRef
Zurück zum Zitat Salmasi, N., Logendran, R., & Skandari, M. R. (2011). Makespan minimization of a flowshop sequence-dependent group scheduling problem. The International Journal of Advanced Manufacturing Technology, 56, 699–710.CrossRef Salmasi, N., Logendran, R., & Skandari, M. R. (2011). Makespan minimization of a flowshop sequence-dependent group scheduling problem. The International Journal of Advanced Manufacturing Technology, 56, 699–710.CrossRef
Zurück zum Zitat Schaller, J. E., Gupta, J. N. D., & Vakharia, A. J. (2000). Scheduling a flowline manufacturing cell with sequence dependent family setup times. European Journal of Operational Research, 125(2), 324–339.CrossRef Schaller, J. E., Gupta, J. N. D., & Vakharia, A. J. (2000). Scheduling a flowline manufacturing cell with sequence dependent family setup times. European Journal of Operational Research, 125(2), 324–339.CrossRef
Zurück zum Zitat Schaller, J. (2001). A new lower bound for the flow shop group scheduling problem. Computers & Industrial Engineering, 41, 151–161.CrossRef Schaller, J. (2001). A new lower bound for the flow shop group scheduling problem. Computers & Industrial Engineering, 41, 151–161.CrossRef
Zurück zum Zitat Shankar, R., & Vrat, P. (1999). Some design issues in cellular manufacturing using the fuzzy programming approach. International Journal of Production Research, 37, 2545–2563.CrossRef Shankar, R., & Vrat, P. (1999). Some design issues in cellular manufacturing using the fuzzy programming approach. International Journal of Production Research, 37, 2545–2563.CrossRef
Zurück zum Zitat Soleymanpour, M., Vrat, P., & Shankar, R. (2002). A transiently chaotic neural network approach to the design of cellular manufacturing. International Journal of Production Research, 40, 2225–2244.CrossRef Soleymanpour, M., Vrat, P., & Shankar, R. (2002). A transiently chaotic neural network approach to the design of cellular manufacturing. International Journal of Production Research, 40, 2225–2244.CrossRef
Zurück zum Zitat Zandieh, M., & Karimi, N. (2011). An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22, 979–989.CrossRef Zandieh, M., & Karimi, N. (2011). An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times. Journal of Intelligent Manufacturing, 22, 979–989.CrossRef
Zurück zum Zitat Zhu, X., & Wilhelm, W. E. (2006). Scheduling and lot sizing with sequence-dependent setups: A literature review. IIE Transactions, 38(11), 987–1007.CrossRef Zhu, X., & Wilhelm, W. E. (2006). Scheduling and lot sizing with sequence-dependent setups: A literature review. IIE Transactions, 38(11), 987–1007.CrossRef
Metadaten
Titel
A hybrid genetic algorithm for minimizing makespan in a flow-shop sequence-dependent group scheduling problem
verfasst von
Antonio Costa
Fulvio Antonio Cappadonna
Sergio Fichera
Publikationsdatum
14.02.2015
Verlag
Springer US
Erschienen in
Journal of Intelligent Manufacturing / Ausgabe 6/2017
Print ISSN: 0956-5515
Elektronische ISSN: 1572-8145
DOI
https://doi.org/10.1007/s10845-015-1049-1

Weitere Artikel der Ausgabe 6/2017

Journal of Intelligent Manufacturing 6/2017 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.