Skip to main content
Erschienen in: Soft Computing 10/2009

01.08.2009 | Original Paper

A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total weighted tardiness

verfasst von: R. Tavakkoli-Moghaddam, M. Khalili, B. Naderi

Erschienen in: Soft Computing | Ausgabe 10/2009

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In this paper, we explore job shop problems with two recently popular and realistic assumptions, sequence-dependent setup times and machine availability constraints to actualize the problem. The criterion is a minimization of total weighted tardiness. We establish a simple criterion to integrate machine availability constraints and scheduling decisions simultaneously. We propose a hybrid meta-heuristic to tackle the given problem. This meta-heuristic method, called EMSA, is a combination of two meta-heuristics: (1) Electromagnetic-like mechanism (EM); and (2) simulated annealing (SA). The hybridization is done to overcome some existing drawbacks of each of these two algorithms. To evaluate the proposed hybrid meta-heuristic method, we carry out a benchmark by which the proposed EMSA is compared with some existing algorithms as well as simulated annealing and electromagnetic-like mechanism alone in a fixed given computational time. All the related results and analysis obtained through the benchmark illustrate that our proposed EMSA is very effective and supersedes the foregoing algorithms.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Wirtschaft"

Online-Abonnement

Mit Springer Professional "Wirtschaft" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 340 Zeitschriften

aus folgenden Fachgebieten:

  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Versicherung + Risiko




Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Baker KR (1974) Introduction to sequencing and scheduling. Wiley, New York Baker KR (1974) Introduction to sequencing and scheduling. Wiley, New York
Zurück zum Zitat Coleman BJ (1992) Technical note: a simple model for optimizing the single machine early/tardy problem with sequence-dependent setups, production and operations. Management 1:225–228 Coleman BJ (1992) Technical note: a simple model for optimizing the single machine early/tardy problem with sequence-dependent setups, production and operations. Management 1:225–228
Zurück zum Zitat Dileep Sule R (1996) Industrial scheduling. PWS, USA Dileep Sule R (1996) Industrial scheduling. PWS, USA
Zurück zum Zitat Holloway C, Nelson R (1974) Job-shop scheduling with due dates and variable processing times. Manage Sci 20(9):1264–1275MATHCrossRef Holloway C, Nelson R (1974) Job-shop scheduling with due dates and variable processing times. Manage Sci 20(9):1264–1275MATHCrossRef
Zurück zum Zitat Mitta IBS, Nagga PC (1973) Two machine sequencing problem with parallel machines. Oper Res 10:50–61 Mitta IBS, Nagga PC (1973) Two machine sequencing problem with parallel machines. Oper Res 10:50–61
Zurück zum Zitat Montgomery DC (2000) Design and analysis of experiments, 5th edn. Wiley, London Montgomery DC (2000) Design and analysis of experiments, 5th edn. Wiley, London
Zurück zum Zitat Pinedo M (1995) Scheduling theory, algorithms, and systems. Prentice-Hall, Englewood Cliffs Pinedo M (1995) Scheduling theory, algorithms, and systems. Prentice-Hall, Englewood Cliffs
Zurück zum Zitat Schneider J, Morgensten I, Singer JM (1998) Bouncing towards the optimum: improving the results of Monte Carlo optimization algorithms. Phys Rev E Stat Phys Plasmas Fluids Relat Interdiscip Topics 58(4):5085–5095. doi:10.1103/PhysRevE.58.5085 Schneider J, Morgensten I, Singer JM (1998) Bouncing towards the optimum: improving the results of Monte Carlo optimization algorithms. Phys Rev E Stat Phys Plasmas Fluids Relat Interdiscip Topics 58(4):5085–5095. doi:10.​1103/​PhysRevE.​58.​5085
Zurück zum Zitat Viond V, Sridharan R (2006) Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis. Int J Adv Manuf Technol doi:10.1007/s00170-006-0836-4 Viond V, Sridharan R (2006) Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis. Int J Adv Manuf Technol doi:10.​1007/​s00170-006-0836-4
Metadaten
Titel
A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total weighted tardiness
verfasst von
R. Tavakkoli-Moghaddam
M. Khalili
B. Naderi
Publikationsdatum
01.08.2009
Verlag
Springer-Verlag
Erschienen in
Soft Computing / Ausgabe 10/2009
Print ISSN: 1432-7643
Elektronische ISSN: 1433-7479
DOI
https://doi.org/10.1007/s00500-008-0367-z

Weitere Artikel der Ausgabe 10/2009

Soft Computing 10/2009 Zur Ausgabe

Premium Partner