Skip to main content
Erschienen in: Rock Mechanics and Rock Engineering 8/2022

20.05.2022 | Original Paper

Application of Full-Scale Experimental Cutterhead System to Study Penetration Performance of Tunnel Boring Machines (TBMs)

verfasst von: Qi Geng, Fei He, Maoxun Ma, Xiaohui Liu, Xuebin Wang, Zeyu Zhang, Min Ye

Erschienen in: Rock Mechanics and Rock Engineering | Ausgabe 8/2022

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

Rock penetration is the most important function of tunnel boring machines (TBMs). Based on a detailed review of TBM rock penetration research, this study introduces a rarely reported full-scale experimental cutterhead system that combines the advantages of in situ penetration tests and laboratory rock-breaking tests. The main focus of this study is to investigate TBM penetration performance using this experimental cutterhead system. Nine groups of penetration tests were conducted on an integral concrete specimen with cutterhead rotational speed and net penetration varying from 1.9 to 5.9 r/min and 2.5 to 8.8 mm/r, respectively. The cutting force and chipping performance of each cutter were monitored, examined, and analyzed considering boreability and mechanical efficiency. The results indicate that the cutter normal force is unaffected by the cutter installment radius and cutterhead rotational speed. However, the muck weight and specific excavation rate increase in perfectly fitted exponential functions with increasing cutter position number, indicating that the cutting efficiency increases with cutter position number. Muck sieving results show that face cutters produce larger and more elongated chips than center cutters, as the extent of cutter side sliding declines with increasing cutter installation radius. The boreability index decreases in a perfectly fitted power function with increasing net penetration, indicating that the critical threshold for cutterhead net penetration is approximately 5 mms/rev. The proposed models predicting the cutter normal force and boreability index were compared with 13 sets of in situ penetration test data. This study can guide TBM excavations encountering rocks with equivalent strength and intactness.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
Zurück zum Zitat Bilgin N (1977) Investigation into the mechanical cutting characteristics of some medium and high strength rocks. Ph.D. Thesis. Ph.D., University of Newcastle upon Tyne Bilgin N (1977) Investigation into the mechanical cutting characteristics of some medium and high strength rocks. Ph.D. Thesis. Ph.D., University of Newcastle upon Tyne
Zurück zum Zitat Bruland A (1998) Hard rock tunnel boring. Ph.D. Thesis. Norwegian University of Science and Technology Bruland A (1998) Hard rock tunnel boring. Ph.D. Thesis. Norwegian University of Science and Technology
Zurück zum Zitat Fenn D, Bowles B, David J, Prutheroe B (1981) The in situ measurement of dynamic cutter forces on a Robbins raiseborer reaming head Mining Technology Laboratory-Chamber of Mines of South Africa, Research Rept No 18/81, Project No GT 2N01 Fenn D, Bowles B, David J, Prutheroe B (1981) The in situ measurement of dynamic cutter forces on a Robbins raiseborer reaming head Mining Technology Laboratory-Chamber of Mines of South Africa, Research Rept No 18/81, Project No GT 2N01
Zurück zum Zitat Geng Q, Wei ZY, Ren J, Macias FJ (2017b) Influence of free face direction on rock breaking by TBM disc cutters. In: Paper presented at the international conference on tunnel boring machines in difficult grounds (TBM DiGs), Wuhan Geng Q, Wei ZY, Ren J, Macias FJ (2017b) Influence of free face direction on rock breaking by TBM disc cutters. In: Paper presented at the international conference on tunnel boring machines in difficult grounds (TBM DiGs), Wuhan
Zurück zum Zitat Geng Q, Ye M, Lu ZY, Liu XH, Wang XB (2021b) Numerical study on free face-assisted rock fragmentation induced by a TBM disk cutter. In: Paper presented at the 11th conference of Asian rock mechanics society, Beijing Geng Q, Ye M, Lu ZY, Liu XH, Wang XB (2021b) Numerical study on free face-assisted rock fragmentation induced by a TBM disk cutter. In: Paper presented at the 11th conference of Asian rock mechanics society, Beijing
Zurück zum Zitat Gobetz F (1974) Development of a boring machine cutter instrumentation program, Final Report, United Aircraft Research Laboratories to Dept of the Interior USBM Contract H0122072, UARL Rept, M-971373-10 Gobetz F (1974) Development of a boring machine cutter instrumentation program, Final Report, United Aircraft Research Laboratories to Dept of the Interior USBM Contract H0122072, UARL Rept, M-971373-10
Zurück zum Zitat Innaurato N, Oggeri C, Oreste PP, Vinai R (2007) Experimental and numerical studies on rock breaking with TBM tools under high stress confinement. Rock Mech Rock Eng 40:429–451CrossRef Innaurato N, Oggeri C, Oreste PP, Vinai R (2007) Experimental and numerical studies on rock breaking with TBM tools under high stress confinement. Rock Mech Rock Eng 40:429–451CrossRef
Zurück zum Zitat Ma HS, Gong QM, Wang J, Zhao XB, Yin LJ, Miao CT, He GW (2016) Linear cutting tests on effect of confining stress on rock fragmentation by TBM cutter. Chinese J Rock Mech Eng 35:346–355 Ma HS, Gong QM, Wang J, Zhao XB, Yin LJ, Miao CT, He GW (2016) Linear cutting tests on effect of confining stress on rock fragmentation by TBM cutter. Chinese J Rock Mech Eng 35:346–355
Zurück zum Zitat Macias F (2016) Hard rock tunnel boring, performance predictions and cutter life assessments. Ph.D. Thesis., Norwegian University of Science and Technology Macias F (2016) Hard rock tunnel boring, performance predictions and cutter life assessments. Ph.D. Thesis., Norwegian University of Science and Technology
Zurück zum Zitat Ozdemir L, Nilsen B (1999) Recommended laboratory rock testing for TBM projects. AUA News 14:21–35 Ozdemir L, Nilsen B (1999) Recommended laboratory rock testing for TBM projects. AUA News 14:21–35
Zurück zum Zitat Roby J, Sandell T, Kocab J, Leif L (2008) The current state of disc cutter design and development directions. In: Paper presented at the North American tunnel congress, San Francisco Roby J, Sandell T, Kocab J, Leif L (2008) The current state of disc cutter design and development directions. In: Paper presented at the North American tunnel congress, San Francisco
Zurück zum Zitat Rostami J (1997) Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure. Ph.D. Thesis. Colorado School of Mines Rostami J (1997) Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure. Ph.D. Thesis. Colorado School of Mines
Zurück zum Zitat Roxborough F, Phillips H (1975) Rock excavation by disc cutter. Int J Rock Mech Min Sci Geomech Abstr 12:361–366CrossRef Roxborough F, Phillips H (1975) Rock excavation by disc cutter. Int J Rock Mech Min Sci Geomech Abstr 12:361–366CrossRef
Zurück zum Zitat Samuel AE, Seow LP (1984) Disc force measurements on a full-face tunnelling machine. Int J Rock Mech Min Sci Geomech Abstr 21:83–96CrossRef Samuel AE, Seow LP (1984) Disc force measurements on a full-face tunnelling machine. Int J Rock Mech Min Sci Geomech Abstr 21:83–96CrossRef
Zurück zum Zitat Snowdon R (1982) A study of disc cutting in selected British rocks. Int J Rock Mech Min Sci Geomech Abstr 19:107–121CrossRef Snowdon R (1982) A study of disc cutting in selected British rocks. Int J Rock Mech Min Sci Geomech Abstr 19:107–121CrossRef
Zurück zum Zitat Song K (2005) Analysis on shield driving performance of a tunnel under river in alternation of mud rock and sand rock bed. Ph.D.Thesis. Beijing Jiaotong University Song K (2005) Analysis on shield driving performance of a tunnel under river in alternation of mud rock and sand rock bed. Ph.D.Thesis. Beijing Jiaotong University
Zurück zum Zitat Stevenson G (1999) Empirical estimates of TBM performance in hard rock. In: Paper presented at the rapid excavation and tunneling conference, pp 993–1010 Stevenson G (1999) Empirical estimates of TBM performance in hard rock. In: Paper presented at the rapid excavation and tunneling conference, pp 993–1010
Zurück zum Zitat Tan Q, Zhang K, Zhou ZL, Xia YM (2010) Numerical simulation and experimental observation of rock cracks under action of spherical tooth hob cutter. Chinese J Rock Mech Eng 29:163–169 Tan Q, Zhang K, Zhou ZL, Xia YM (2010) Numerical simulation and experimental observation of rock cracks under action of spherical tooth hob cutter. Chinese J Rock Mech Eng 29:163–169
Zurück zum Zitat Tan Q, Yi N, Xia Y, Xu Z, Zhu Y, Song J (2012) Research on rock dynamic fragmentation characteristics by TBM cutters and cutter spacing optimization. Chinese J Rock Mech Eng 31:2453–2464 Tan Q, Yi N, Xia Y, Xu Z, Zhu Y, Song J (2012) Research on rock dynamic fragmentation characteristics by TBM cutters and cutter spacing optimization. Chinese J Rock Mech Eng 31:2453–2464
Zurück zum Zitat Thyagarajan MV (2018) The comparison of cutting forces on disc cutters in constant vs variable penetration modes. MSc Thesis. Colorado School of Mines Thyagarajan MV (2018) The comparison of cutting forces on disc cutters in constant vs variable penetration modes. MSc Thesis. Colorado School of Mines
Metadaten
Titel
Application of Full-Scale Experimental Cutterhead System to Study Penetration Performance of Tunnel Boring Machines (TBMs)
verfasst von
Qi Geng
Fei He
Maoxun Ma
Xiaohui Liu
Xuebin Wang
Zeyu Zhang
Min Ye
Publikationsdatum
20.05.2022
Verlag
Springer Vienna
Erschienen in
Rock Mechanics and Rock Engineering / Ausgabe 8/2022
Print ISSN: 0723-2632
Elektronische ISSN: 1434-453X
DOI
https://doi.org/10.1007/s00603-022-02886-9

Weitere Artikel der Ausgabe 8/2022

Rock Mechanics and Rock Engineering 8/2022 Zur Ausgabe