Skip to main content
Erschienen in: The International Journal of Advanced Manufacturing Technology 7-8/2024

22.02.2024 | ORIGINAL ARTICLE

A disturbance evaluation method for scheduling mechanisms in digital twin-based workshops

verfasst von: Pengjun Yue, Tianliang Hu, Yongli Wei, Lili Dong, Qi Meng, Songhua Ma

Erschienen in: The International Journal of Advanced Manufacturing Technology | Ausgabe 7-8/2024

Einloggen

Aktivieren Sie unsere intelligente Suche, um passende Fachinhalte oder Patente zu finden.

search-config
loading …

Abstract

In the workshop scheduling problem, frequent disturbances lead to continuous and frequent rescheduling. This is detrimental to the optimal utilization of production resources, the maximization of production efficiency, and the minimization of operational costs. Therefore, finding an effective method to reduce frequent rescheduling is crucial for stable and efficient workshop operations. This paper introduces digital twin (DT) technology. Serving as a digital replica of a physical system, DT establishes an interactive connection between the physical entity and its digital counterpart. It has been applied in multiple fields. A disturbance evaluation method for scheduling mechanisms based on DT technology is proposed and studied in this paper. Firstly, this method evaluates the impact of disturbances by using a causal factor chart (CFC) and convolutional neural networks (CNN). Then, corresponding scheduling mechanisms are proposed based on the degree of disturbance impact. DT technology is used to provide data and model support throughout the entire process. Through the experimental verification, workshop disturbances were accurately evaluated by this method. Two unnecessary instances of rescheduling were avoided, resulting in a 66.3% reduction in the time to handle disturbances. The experimental results show that the proposed method can enhance the adaptability of scheduling mechanisms and contribute to a more agile response to disturbances.

Sie haben noch keine Lizenz? Dann Informieren Sie sich jetzt über unsere Produkte:

Springer Professional "Wirtschaft+Technik"

Online-Abonnement

Mit Springer Professional "Wirtschaft+Technik" erhalten Sie Zugriff auf:

  • über 102.000 Bücher
  • über 537 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Finance + Banking
  • Management + Führung
  • Marketing + Vertrieb
  • Maschinenbau + Werkstoffe
  • Versicherung + Risiko

Jetzt Wissensvorsprung sichern!

Springer Professional "Technik"

Online-Abonnement

Mit Springer Professional "Technik" erhalten Sie Zugriff auf:

  • über 67.000 Bücher
  • über 390 Zeitschriften

aus folgenden Fachgebieten:

  • Automobil + Motoren
  • Bauwesen + Immobilien
  • Business IT + Informatik
  • Elektrotechnik + Elektronik
  • Energie + Nachhaltigkeit
  • Maschinenbau + Werkstoffe




 

Jetzt Wissensvorsprung sichern!

Literatur
1.
Zurück zum Zitat Zweben M, Fox M (1994) Intelligent scheduling. Morgan Kaufmann, San Francisco Zweben M, Fox M (1994) Intelligent scheduling. Morgan Kaufmann, San Francisco
15.
Zurück zum Zitat Li Z (2019) Multi-task scheduling optimization in shop floor based on uncertainty theory algorithm. Acad J Manuf Eng 17(1):104–112 Li Z (2019) Multi-task scheduling optimization in shop floor based on uncertainty theory algorithm. Acad J Manuf Eng 17(1):104–112
19.
Zurück zum Zitat Valledor P, Gomez A, Puente J, Fernandez I (2022) Solving rescheduling problems in dynamic permutation flow shop environments with multiple objectives using the hybrid dynamic non-dominated sorting genetic II algorithm. Mathematics 10(14):2395. https://doi.org/10.3390/math10142395CrossRef Valledor P, Gomez A, Puente J, Fernandez I (2022) Solving rescheduling problems in dynamic permutation flow shop environments with multiple objectives using the hybrid dynamic non-dominated sorting genetic II algorithm. Mathematics 10(14):2395. https://​doi.​org/​10.​3390/​math10142395CrossRef
36.
Zurück zum Zitat Vidyasagar A (2016) The art of root cause analysis. Qual Prog 49(1):48 Vidyasagar A (2016) The art of root cause analysis. Qual Prog 49(1):48
39.
Zurück zum Zitat Zhang T, Ji W, Qiu Y (2020) Multi-source disturbance modeling and analysis for intelligent manufacturing. UPB Sci Bull Ser D: Mech Eng 82(4):257–268 Zhang T, Ji W, Qiu Y (2020) Multi-source disturbance modeling and analysis for intelligent manufacturing. UPB Sci Bull Ser D: Mech Eng 82(4):257–268
42.
Zurück zum Zitat Ansori I, Waskito DH, Mutharuddin M, Irawati N, Nugroho S, Mardiana TS et al (2023) Enhancing brake system evaluation in periodic testing of goods transport vehicles through FTA-FMEA risk analysis. Automot Experiences 6(2):320–335. https://doi.org/10.31603/ae.8394CrossRef Ansori I, Waskito DH, Mutharuddin M, Irawati N, Nugroho S, Mardiana TS et al (2023) Enhancing brake system evaluation in periodic testing of goods transport vehicles through FTA-FMEA risk analysis. Automot Experiences 6(2):320–335. https://​doi.​org/​10.​31603/​ae.​8394CrossRef
49.
Zurück zum Zitat Krizhevsky A, Hinton GE (2011) Using very deep autoencoders for content-based image retrieval. In: Proceedings of the 19th European Symposium on Artificial Neural Networks, Bruges, Belgium, pp 1–7 Krizhevsky A, Hinton GE (2011) Using very deep autoencoders for content-based image retrieval. In: Proceedings of the 19th European Symposium on Artificial Neural Networks, Bruges, Belgium, pp 1–7
51.
Zurück zum Zitat Campo EA, Cano JA, Gomez-Montoya R, Rodriguez-Velasquez E, Cortes P (2022) Flexible job shop scheduling problem with fuzzy times and due-windows: Minimizing weighted tardiness and earliness using genetic algorithms. Algorithms 15(10). https://doi.org/10.3390/a15100334 Campo EA, Cano JA, Gomez-Montoya R, Rodriguez-Velasquez E, Cortes P (2022) Flexible job shop scheduling problem with fuzzy times and due-windows: Minimizing weighted tardiness and earliness using genetic algorithms. Algorithms 15(10). https://​doi.​org/​10.​3390/​a15100334
52.
Zurück zum Zitat Fonseca-Reyna YC, Martínez-Jiménez Y, Nowé A (2018) Q-learning algorithm performance for m-machine, n-jobs flow shop scheduling problems to minimize makespan. Investig Oper 38(3):281–290MathSciNet Fonseca-Reyna YC, Martínez-Jiménez Y, Nowé A (2018) Q-learning algorithm performance for m-machine, n-jobs flow shop scheduling problems to minimize makespan. Investig Oper 38(3):281–290MathSciNet
Metadaten
Titel
A disturbance evaluation method for scheduling mechanisms in digital twin-based workshops
verfasst von
Pengjun Yue
Tianliang Hu
Yongli Wei
Lili Dong
Qi Meng
Songhua Ma
Publikationsdatum
22.02.2024
Verlag
Springer London
Erschienen in
The International Journal of Advanced Manufacturing Technology / Ausgabe 7-8/2024
Print ISSN: 0268-3768
Elektronische ISSN: 1433-3015
DOI
https://doi.org/10.1007/s00170-024-13251-1

Weitere Artikel der Ausgabe 7-8/2024

The International Journal of Advanced Manufacturing Technology 7-8/2024 Zur Ausgabe

    Marktübersichten

    Die im Laufe eines Jahres in der „adhäsion“ veröffentlichten Marktübersichten helfen Anwendern verschiedenster Branchen, sich einen gezielten Überblick über Lieferantenangebote zu verschaffen.